An office move touches every part of a business: leases, budgets, IT, staff, vendors, and two sets of building managers. Without a plan, small tasks pile up in the final two weeks and the move day turns into a scramble.
This office relocation checklist breaks the project into a 12-week schedule. Larger offices should start earlier, and small suites can compress the timeline, but the order of tasks stays roughly the same.
Before You Start: Pick a Move Coordinator
Assign one person to own the move. That person keeps the checklist, talks to vendors, answers staff questions, and makes final calls when plans change. In larger companies, a small committee with someone from IT, facilities, and HR helps, but one name should still be on every decision.
Set up a shared folder for floor plans, contracts, building rules, and the master inventory. It saves hours of searching later.
Weeks 12 to 10: Set the Foundation
These first weeks are about scope, budget, and dates.
- Review your current lease. Confirm the surrender date, restoration requirements, and notice deadlines.
- Confirm the new space timeline. Ask the landlord or contractor when the space will be ready, including power, data cabling, and furniture installation.
- Set a budget. Include movers, IT vendors, new furniture, disposal, cleaning, and contingency. Our breakdown of what an office move costs explains the main cost drivers.
- Pick a target move date, plus a backup. Weekends and evenings are popular, so plan around them early.
- Request building rules from both properties: elevator reservations, dock hours, insurance requirements, and move windows.
Weeks 9 to 7: Book Vendors and Plan the Space
With dates and budget set, lock in the people who will do the work.
- Get site surveys and written estimates from at least two moving companies. Experienced commercial movers in Pittsburgh will already know how Downtown towers and suburban office parks handle move-ins.
- Book your IT vendor or internal team for disconnection, transport planning, and reconnection.
- Order new furniture if needed, with a delivery date before move day.
- Create a floor plan for the new space with numbered workstations, offices, and rooms.
- Arrange transfers or new service for internet, phones, security systems, and utilities.
Internet and phone installation can take weeks in some buildings, so do not leave it for later.
Weeks 6 to 4: Inventory, Purge, and Communicate
This is the stretch where most of the sorting happens.
- Build a full inventory of furniture, equipment, and records, and mark each item as moving, storing, donating, or disposing.
- Schedule removal for items that are not moving. Old furniture, electronics, and files need a plan before move day.
- Set records rules. Decide which files move, which go to off-site storage, and which can be securely shredded.
- Tell your staff the move date, packing responsibilities, and what to expect in the new space.
- Notify clients and vendors of your new address and any service interruptions.
- Order printed materials with the new address, such as letterhead, business cards, and signage.
- Update your address with banks, insurers, the post office, and online listings, timed to take effect on move day.
Weeks 3 to 2: Pack and Prepare
Packing should start with what nobody uses daily.
- Pack archives, storage rooms, and common areas first.
- Give each employee crates or boxes and labels that match the new floor plan numbers.
- Back up all critical data and confirm the IT shutdown schedule.
- Photograph complex equipment setups and cable connections before disconnection.
- Confirm elevator and dock reservations in writing with both buildings.
- Send your mover a final inventory and floor plan, and confirm the crew size and start time.
- Provide certificates of insurance to both building managers.
Label every box and piece of furniture with a room or workstation number, not just a name. Movers place items by number much faster than by hunting for a person’s office.
Week 1: Final Countdown
- Hold a short meeting with staff to review move day instructions.
- Have employees pack their desks and personal items by the last workday.
- Clear out refrigerators and break rooms.
- Shut down computers and disconnect equipment on schedule.
- Prepare a move day contact sheet with phone numbers for the coordinator, movers, IT, and both buildings.
- Plan for weather. In Western PA, a winter move may need salt for walkways and extra time for icy roads.
Move Day and the Week After
On move day, the coordinator should be at the origin until the last truck leaves, with a second person directing the crew at the destination. Walk the old space at the end to catch anything left behind.
After the move:
- Test internet, phones, printers, and workstations before staff arrive.
- Walk the new space to check for damage and confirm everything landed in the right place.
- Complete restoration work at the old space and schedule the landlord walkthrough.
- Return keys, access cards, and parking passes.
- Collect staff feedback on missing items or setup issues and resolve them quickly.
For more detail on closing out the old space, see our office move-out guide.
Pittsburgh Details Worth Planning For
A few local factors catch businesses off guard. Downtown buildings often limit moves to evenings and weekends and require floor protection along the move path. Bridges, tunnels, and one-way streets can add drive time between locations. Many suburban properties sit on hills with steep lots that slow loading in bad weather. Build a little extra time into your schedule for all of these.
FAQs
How Far in Advance Should We Start an Office Move?
Twelve weeks works for most small and midsize offices. Larger companies or moves that involve new construction should start four to six months ahead.
Who Should Pack Employee Desks?
Most companies ask employees to pack their own desks and personal items, while movers handle furniture, equipment, and common areas. Professional packing is also available for the whole office.
What Should Be on a Move Day Contact Sheet?
Include the move coordinator, mover’s on-site lead, IT contact, both building managers, and key vendors, with cell phone numbers for each.
How Do We Keep the Business Running During the Move?
Schedule the physical move for an evening or weekend, back up data in advance, and test systems in the new space before staff return.
What Is the Most Commonly Missed Task?
Ordering internet and phone service for the new space early enough. Installation lead times can delay the whole move.
Plan Your Office Move With Central Van Lines
A 12-week office moving checklist turns a large project into manageable steps and keeps the last two weeks calm. Central Van Lines has helped businesses relocate across Pittsburgh and the surrounding region since 1997. Request a free quote and we will help you build a schedule that fits your office.